Best Practices for Passing the AAMA 501.2 Test
Schedule testing before internal finishes are installed
Use experienced installers and third-party testers
Perform mock-up testing off-site if possible
Coordinate with the design team to verify drawings and details
Schedule testing before internal finishes are installed